BECA Palmwoods WWTP | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
BECA Palmwoods WWTP
ProjectsCase study
BECA Palmwoods WWTP

BECA Palmwoods WWTP

Location
Palmwoods, NSW
Industry
Water – Industrial
Scope
Design, construction
The Project

Project overview.

This project was part of a waste water treatment plant for a herbs and paste processing facility. The WWTP will address partial solids removal and PH correction. It will include screening, flow balancing, chemical dosing and discharge of wastewater to the sewer network. The second part of the scope will address removal of oil & grease and COD to achieve full compliance for discharge to Unitywater sewer network.

BECA Palmwoods WWTP - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Sinexcel Active Harmonic Filter 415V
  • 50A
  • Allen Bradley CompactLogix PLC
  • Allen Bradley AB Powerflex 525 VSD’s
  • 21.5” Schneider HMI
Project Scope

What we delivered.

Have a project like this?

Dependable Partner.Flexible Can-Do.Expertise All In-House.
Request a quote