The Project

Project overview.

This Motor Control Centre was for a sewerage treatment plant that was installed underground at the Cowal Gold Mine. Additional STP capacity is required to manage wastewater associated with additional activity on site. The new STP was installed parallel with the existing STP and when operational, the full sewage flow of the site is sent to the new STP.

Cowal Gold Mine Sewage Treatment Plant - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Allen Bradley CompactLogix PLC
  • ABB Powerflex VSD’s
  • Allen Bradley 10” Panel View 7 HMI
  • 2mm MS Custom Kiosk Enclosure
Project Scope

What we delivered.