FEATURES & SPECIFICATIONS
Built to spec, built to last.
Board specifications
- EcoStruxure GeoSCADA
- Omron CJ2M PLC
- Schneider ATV320 VSD’s
Motor Control Centre for a waste water treatment plant for the township of Cullen Bullen. The project is to replace the existing septic tank system with a pressure driven reticulation system that will send effluent from the township to a WWTP for treatment. Providing a more reliable and centralised sewage treatment system for local residents.