FEATURES & SPECIFICATIONS
Built to spec, built to last.
Board specifications
- 5 pumps on VSDs
- 2 pumps on DOL
- 300+ IO’s on a Siemens S7-1200 PLC
- 4G Remote monitoring access
Removal of PFAS impacted groundwater that originates from the fire training area on site