Fosterville Gold Water Treatment Plant | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Fosterville Gold Water Treatment Plant
ProjectsCase study
Fosterville Gold Water Treatment Plant

Fosterville Gold Water Treatment Plant

Location
Kirkland Lake Goldmine, VIC
Industry
Water – Industrial · Mining
Scope
Design, construction, programming, commissioning
The Project

Project overview.

Motor Control Centre for a Water Treatment plant

Fosterville Gold Water Treatment Plant - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • 15+ pumps on VSD
  • 10+ pumps on DOL
  • MCC installed in a container at Metroid
  • Panel View Plus 15” HMI
  • 350+ IOs on Allen Bradley
  • CompactLogix PLC
Project Scope

What we delivered.

Have a project like this?

Dependable Partner.Flexible Can-Do.Expertise All In-House.
Request a quote