GWW Containerised WTP
ProjectsCase study
GWW Containerised WTP

GWW Containerised WTP

Location
Romsey, VIC
Industry
Water – Industrial
Scope
Design, construction, programming, commissioning
The Project

Project overview.

2 control panels to treat 2 containerised 45m3/hr UF plants. The Containerized WTP is for treating Romsey lagoon secondary treated effluent wastewater such that it remains within recycled water quality limits prior to discharge to downstream irrigation users and local waterways.

GWW Containerised WTP - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Allen Bradley CompactLogix PLC
  • Schneider Altivar 650 VSD’s
  • Schneider Proface 15” HMI
Project Scope

What we delivered.