Jacobina Mine Evaporator System | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Jacobina Mine Evaporator System
ProjectsCase study
Jacobina Mine Evaporator System

Jacobina Mine Evaporator System

Location
Jacobina, Brazil
Industry
Other Industries · Mining
Scope
Design, construction, programming, commissioning
The Project

Project overview.

Control panel for an evaporator system

Jacobina Mine Evaporator System - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • 110kW pump on soft starter
  • 185kW pump on soft starter
  • Siemens S7-1200 controller and 7” HMI
  • 2 90kW evaporator fans on soft starters
  • 2 75kW evaporator fans on soft starters
Project Scope

What we delivered.