FEATURES & SPECIFICATIONS
Built to spec, built to last.
Board specifications
- Danfoss FC-302 Inverter Drives
- Siemens S7-300 PLC
- Remlive Indicator 3ph isolator check
This MCC was manufactured for the Muja water treatment plant. The WTP is required to treat raw water sourced from deep underground bores and produce potable water which complies with all requirements of the Australian Drinking Water Guidelines. The WTP is to be operational 22 hours per day.