FEATURES & SPECIFICATIONS
Built to spec, built to last.
Board specifications
- 7 x Pumps on DOL
- Siemens 12” MTP1200 HMI
- Siemens PLC
- Ewon 4G Router
- 9 x ABB ACQ580 VSD’s
The raw water to be treated in the PFAS Water Treatment Plant is sourced from the Eastern Retention Basin, located roughly 1km from the facility. It then goes through 7 stages of treatment.