Sodium Cyanide Expansion WTP | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Sodium Cyanide Expansion WTP
ProjectsCase study
Sodium Cyanide Expansion WTP

Sodium Cyanide Expansion WTP

Location
Kwinana, WA
Industry
Water – Industrial
Scope
Design, construction, programming
The Project

Project overview.

For this Sodium Cyanide Expansion Water Treatment Plant the scope was originally to manufacture 2 smaller MCCs. Our engineers worked with the client to provide an alternative solution to save space by creating a single MCC, with segregated distribution chassis for each plant.

Sodium Cyanide Expansion WTP - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • 400A 36kA Form 3bih Metroid Mild Steel Type tested Switchboard
  • Fabricated IP65 316SS Kiosk
  • 2 x 316SS cosmotec 5600W air conditioners
  • Kiosk base fitted with custom industrial anti-slip floor lining
  • 18 x Danfoss FC202 Aqua VSD’s
Project Scope

What we delivered.

Have a project like this?

Dependable Partner.Flexible Can-Do.Expertise All In-House.
Request a quote