Stromlo Chlorination Water Treatment Plant | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Stromlo Chlorination Water Treatment Plant
ProjectsCase study
Stromlo Chlorination Water Treatment Plant

Stromlo Chlorination Water Treatment Plant

Location
Mount Stromlo, ACT
Industry
Water – Industrial
Scope
Design, construction
The Project

Project overview.

Multiple boards for the Chlorine Dosing System renewal project at Mt Stromlo Water Treatment Plant and Googong Water Treatment Plant. Boards for chlorine dosing system included a MCC, distribution boards, PLC equipment, cabling and integration into the existing site control/monitoring system

Stromlo Chlorination Water Treatment Plant - Switchboard-1
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Allen Bradley Devicenet Remote I/O and Flex I/O Modules
  • Use of Custom and B&R Enclosures
  • Schneider gear throughout
Project Scope

What we delivered.

Have a project like this?