Surf Coast Aquatic & Health Centre | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Surf Coast Aquatic & Health Centre
ProjectsCase study
Surf Coast Aquatic & Health Centre

Surf Coast Aquatic & Health Centre

Location
Torquay, VIC
Industry
Commercial Pools
Scope
Design, construction, programming
The Project

Project overview.

The Torquay based Wuirdi Baierr Aquatic and Recreation Centre is a new construction that will feature: 25m indoor pool, warm water exercise hydrotherapy and leisure pool, and a program pool with a spa.

Surf Coast Aquatic & Health Centre - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • ABB ACS310 VSD’s
  • Weintek 10” HMI
  • Siemens S7-1200 PLC
  • 6 pumps on DOL
Project Scope

What we delivered.

Have a project like this?

Dependable Partner.Flexible Can-Do.Expertise All In-House.
Request a quote