Built to spec, built to last.
Board specifications
- Siemens S7-1200 PLC
- ABB ACS310 VSD’s
- Weintek 10.1” HMI
- Ewon flexy router Base 4x Ethernet
The Tara 25m Pool is a municipal aquatic facility in the Western Downs Regional Shire. The project involves the replacement of a dilapidated 50m pool with a new 25m pool, and replacement of filtration plant to the toddlers and waterplay systems along with the equipment room