The Project

Project overview.

This main switchboard is for a major sewage pumping station in NSW. To minimise and mitigate operational risks, the local council decided to install four sets of submersible dry well type pumps with new variable frequency switchgear.

Troy Gully Pump Station MCC - Switchboard-1
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Schneider 1250A TransferPacT
  • Automatic Transfer Switch
  • ComPacT NS1250N 50kA 4P MicroLogic
  • 2.0 Control unit
Project Scope

What we delivered.