Wrigley Mars Waste Water Treatment Plant | Metroid Electrical Engineering
Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Wrigley Mars Waste Water Treatment Plant
ProjectsCase study
Wrigley Mars Waste Water Treatment Plant

Wrigley Mars Waste Water Treatment Plant

Location
Asquith, NSW
Industry
Water – Industrial
Scope
Design, construction, programming, commissioning
The Project

Project overview.

This purpose waste water treatment at the MARS Asquith site is to produce water suitable for onsite reuse, meeting the quality requirements for cooling towers and boilers. The project included a main MCC, a chemical dosing MCC and an existing pumps control panel.

Wrigley Mars Waste Water Treatment Plant - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Danfoss Aqua VSD’s
  • Allen Bradley CompactLogix PLC
  • Weintek 10” HMI
  • Allen Bradley Switchgear throughout
Project Scope

What we delivered.

Have a project like this?

Dependable Partner.Flexible Can-Do.Expertise All In-House.
Request a quote