FEATURES & SPECIFICATIONS
Built to spec, built to last.
Board specifications
- Double sided B&R enclosure
- Allen Bradley CompactLogic PLC
- GeoSCADA
- ABB ACS580 VSD’s
- Schneider Switchgear throughout
- Arc Flash Relay
The Wyangala Dam Wall Raising Project was put in place as a requirement to increase the capacity of the dam by raising the existing wall. The project involved a replacement of the Wyangala Water Treatment Plant to accomodate the holiday park reconfiguration, and provide potable water to the Wyangala Village.